| dc.contributor.author | Galista, Benediktus Derry | |
| dc.contributor.author | Kodrat, David Sukardi | |
| dc.date.accessioned | 2024-04-15T03:57:23Z | |
| dc.date.available | 2024-04-15T03:57:23Z | |
| dc.date.issued | 2023 | |
| dc.identifier.issn | P-ISSN : 23016280 E-ISSN : 27219879 | |
| dc.identifier.uri | https://dspace.uc.ac.id/handle/123456789/7277 | |
| dc.description.abstract | The goal is to recognize and examine the factors that shape costs in
construction companies in Surabaya. The sample of this research used
employees at construction companies in Surabaya. The sample group is
equivalent to the full population, namely 103 respondents. Research
variables used in the study are: Product Quality Improvement (x1);
Increased Worker Productivity (x2); Reducing Unnecessary Costs (x3);
Material Order Timeliness (x4); Material Delivery Timeliness (x5); Materials
and Tools Inventory (x6); Rework; (x7) Company overhead (x8); Cost of
Materials/Materials (x9); Project duration (x10); Performance optimization
(x11); Ensure inventory and tool performance (x12); Company performance
control (x13); Rework (x14); Reduced rework (x15); Management of the
financial performance of the firm (x16); Improving the financial
performance of the firm (x17); Material cost control (x18); Optimizing
material costs (x19); Control the time working on the project (x20); and
Optimizing project execution time (x21). The approach employed in this
study is quantitative exploratory. The analytical approach utilized is
exploratory factor analysis. The findings indicated that from 19 tested
indicators, 6 factors formed the cost of construction companies. The six
factors that shape costs in construction companies are: timeliness of orders,
contractor costs, quality control, optimization of project | en_US |
| dc.publisher | SEAN INSTITUTE | en_US |
| dc.subject | Construction Costs | en_US |
| dc.subject | Quality Control | en_US |
| dc.subject | Job Optimization | en_US |
| dc.subject | Productivity | en_US |
| dc.subject | Inventory Performance | en_US |
| dc.title | FACTORS WHICH FORM COSTS IN CONSTRUCTION COMPANIES IN SURABAYA | en_US |
| dc.type | Article | en_US |